Author Topic: September Trail Build  (Read 52 times)

0 Members and 1 Guest are viewing this topic.

Offline praveensm27

  • LDTR Committee
  • Newbie
  • *
  • Posts: 2
  • Karma: 0
September Trail Build
« on: September 15, 2018, 08:34:44 PM »
       Trial Build/Maintenance Day

DATE & TIME: Saturday 22nd of September 8:30am

REGISTRATION:

Online registration will be posted soon. However, you are more than welcome to turn up on the day and sign in there.

MEETING POINT:

Parks VIC Deport (Just above the Skill Park) 13 Reservoir Road, Narre Warren North.

WORKS:

We will be working on Middle Trail between E W Break and Donelan Track to maintain and reshape exiting trail features and address existing drainage issues.

BRING:

Water, food, shovel (If you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather.

Please let us know if you are attending by replying on this forum thread, so we can organise tools and food etc.

If you have any question, please ask away.

BBQ and cold drinks will be provided for free to volunteers at the end of the build.

BYO food if you have a special food requirement

Builds usually run for 4-6 hours and if you want to leave early or arrive late on that day, please message me on this forum or contact us via our form at www.lysterfieldmtb.com.

Hope to see you there.

Cheers.


Sent from my iPhone using Tapatalk

Offline Nate

  • LDTR Committee
  • Hero Member
  • *
  • Posts: 831
  • Karma: 65535
LDTR Social Media & Head Trail Builder

Want to race at Lysterfield? Checkout the racing area!